X

PRODUCTS

Electric hoists represent their own machinery, strength, and toughness, while the stage is elegant, flowing, and soft, with conflicts and collisions between the two.

Certified Efficient And Stable 2 Ton Chain Hoist

Time:2024-01-05

Brief Explanation :

Firstly, before carrying out lifting operations, it is necessary to have a rough estimate of the weight of the heavy object.

Category : Stage Chain Hoist Series

Get a Quote

Product Details

Adequate preparation work should be done before the lifting operation of the chain hoist

Firstly, before carrying out lifting operations, it is necessary to have a rough estimate of the weight of the heavy object. The nameplate of the chain hoist clearly indicates the maximum lifting tonnage. If the maximum tonnage indicated on the nameplate does not meet the weight of the heavy object, we should replace it with a chain hoist that meets the load requirements for operation and avoid overloading.

Secondly, before lifting, check whether the various components of the chain hoist are intact and undamaged, and whether there are any twisted joints in the zipper strip and lifting chain. If the wear of the chain exceeds 10% of the chain diameter, the operation should be stopped immediately and replaced. Before lifting, it is necessary to conduct no-load debugging and observe whether there are any abnormal phenomena in the braking system. Only after everything is correct can the operation be carried out.

These small details before homework may seem insignificant, but they actually play a crucial role in our safety. This is like our warm-up exercise before the 100 meter race, which accelerates blood circulation and prevents our muscles from becoming tense, making it easier to strain them during the race. The same goes for the warm-up of a chain hoist, which involves doing a good job of warm-up before use to minimize the risk of safety accidents.

Stage Chain Hoists

RELATED PRODUCTS .

RELATED NEWS .

Copyright © 2023 Tianjin Kemei Machinery Manufacturing Co., Ltd