X
Hand chain hoists and electric hoists have always been highly praised in the field of infrastructure construction and favored by a large number of construction workers.
Although stage construction work does not involve high altitude operations, the abundance of hardware equipment still puts considerable pressure on the builders.
1.When packaging electric hoists, the main engine and related components should be disassembled and placed.
The stage electric hoist is a specialized equipment used for stage construction, equipment lifting and installation, and other operations.
Some people say that the chain hoist should be regularly coated with grease, which not only avoids rusting of components, but also reduces component wear, slows down tool damage, and prolongs service
The reason why stage electric hoists are capable of performing stage construction tasks is not only because they have good portability and load capacity, but also because they can integrate well with
A complete and undamaged chain hoist can smoothly rise and fall. Once there is a problem with the chain hoist's rise or fall, it indicates that there must be some abnormality inside.
Firstly, before carrying out lifting operations, it is necessary to have a rough estimate of the weight of the heavy object.